August 2008


Free eNewsletter Subscription

LiveFrom - Cable-Tec EXPO '08

CED Home
E-newsletters
CED Broadband Direct Archive
IP Capsule Archive
Product Showcase Archive
xOD Capsule Archive
Subscribe to CED

Tools
Emerging Tech '08 Show Daily
Broadband White Papers
Buyers Guide
Events Calendar
Webcasts
CED Wallcharts
Live From the Show Video Archive
View From the Top Video Archive

Topics
Broadband Business
Cable Telephony
Digital Future
Fiber Optics
HFC Architecture
Internet Services

Magazine
Archives
Current Issue
Digital Edition Sample
Show Dailies
Subscribe to Print

Editorial
Contact the Editor
Editorial Staff
Feedback
News Release Policy
Reprints
Submit Event for Online Calendar
Submit News Release
Submit Your White Paper

Advertising
2008 Editorial Calendar
Ad Specifications
List Rental
Media Kit
BPA Statement (June 2007)
Sales Contacts

Our Partner Sites
ECN
Product Design & Development
Wireless Week

Quick Links
Media Kit



CED Calendar & Buyers' Guide




SCTE begins work on cable FTTP standards
By Brian Santo
CedMagazine.com - March 31, 2008

Fiber-to-the-premise (FTTP) is now on the roadmap for cable – unofficially, but still. The Society of Cable Telecommunications Engineers (SCTE) recently began development of a suite of technical industry standards to support greater use of optical fiber in hybrid fiber/coax (HFC) cable networks.

The trend, frequently referred to as “RF over Glass,” concerns the expanded use of optical fiber while continuing to deliver current cable services and technologies. Standards have become necessary with the increasing requirement for additional bandwidth and the growing use of FTTP (largely in greenfield deployments).

The development program is being conducted by the SCTE Interface Practices Subcommittee (IPS). Part of IPS’ RF over Glass focus in the early going has been on a document entitled “IPS SP 910, RF over Glass System Overview.”

This working document addresses DOCSIS and cable television’s HFC systems, an environment where data and video share the same RF spectrum.

Other points of focus for IPS concerning RF over Glass are:

• Specification for performance of fiber optic passive splitters and directional couplers
• Specification for fiber optic passive filters
• Specification for RF over Glass gateway RF levels
• Specification for RF over Glass gateway operation: burst transmitter RF input trigger power level range specification
• Specification for RF over Glass gateway optical input and output RF levels and wavelengths
• RF over Glass gateway environmental requirements
• Recommended practices for mid-split cable equipment and system operations.

The SCTE Standards Program is open to any individual or organization willing to participate and pay a membership fee. More information – including membership benefits, requirements and fees – is available here or by contacting SCTE Vice President of Standards Steve Oksala at soksala@scte.org or 610-363-6888.

More Broadband Direct:

• RCN upgrades VOD portal with SeaChange equipment 

• Survey: VOD, HD main quality concerns for MSOs 

• Juniper expands its mobile backhaul solution 

• Cinea’s solution enables traceable forensic watermarking of VOD content 

• SCTE begins work on cable FTTP standards 

• Broadband Briefs for 3/31/08


Related Content
Gorman joins SCTE Foundation’s board
WSJ report: Cable will have to deploy FTTP
Cable One rides Wave7 for FTTP

 


Search CED
 

Sponsors





Upcoming Events

 IBC 2008 Conference - Click Here

2008 FTTH Conference & Expo 

TelcoTV08 - Register Now



Advantage Business Media
Use of this web site is subject to its Terms and Conditions of Use.
Copyright 2008 Advantage Business Media. View our Privacy Policy.